Nantong Wantong Steel Pipe Co., Ltd. Waste Acid Comprehensive Utilization Project
Public participation in environmental impact assessment (first time)
(1) Name and Overview of the Construction Project
Project Name: Nantong Wantong Steel Pipe Co., Ltd. Waste Acid Comprehensive Utilization Project;
Construction unit: Nantong Wantong Steel Pipe Co., Ltd;
Construction location: within the factory area of Nantong Wantong Steel Pipe Co., Ltd. in Hai'an County, Nantong City, Jiangsu Province;
Investment amount: 2.155 million RMB;
Project Overview and Construction Content: Nantong Wantong Steel Pipe Co., Ltd. plans to purchase major equipment such as clear water lifting pumps, mixers, enamel reaction vessels, circulation pumps, and maturation lifting pumps within the existing factory area to comprehensively utilize the waste acid generated in the company's acid washing section. After the completion of the project, the annual output of multi effect biochemical wastewater deep treatment agents will be 20000 tons.
(2) Name and contact information of the construction unit
Construction unit: Nantong Wantong Steel Pipe Co., Ltd
Contact: Mr. Ji
Phone: 13584709661
(3) Institution and contact information for undertaking environmental impact assessment work
Evaluation unit: Jiangsu Environmental Protection Industry Technology Research Institute Co., Ltd
Contact: Mr. Zhang
Phone: 025-85699062
E-mail 1014045616@qq.com
(4) Environmental Impact Assessment Work Procedure and Main Job Content:
Work procedure: Collecting data, conducting on-site inspections, conducting investigations and analyses, monitoring the current environmental situation, predicting and evaluating environmental impacts, conducting comprehensive analysis (including public participation, environmental management, environmental monitoring, environmental protection measures, and accident risks), drawing conclusions, writing reports, expert reviews, and submitting to the environmental protection department for approval.
Main job responsibilities: Through investigating the current environmental status of the project site and evaluating the potential secondary pollution caused by the project during construction and operation, as well as its impact on the surrounding ecological environment, understand and analyze the current environmental quality status and the degree of impact of the proposed project on the surrounding environment. Propose countermeasures and measures to avoid or reduce environmental pollution, and demonstrate the environmental feasibility of the project construction from an environmental perspective, providing scientific basis for environmental management.
(5) Scope and precautions for soliciting public opinions
The scope of this public opinion solicitation is within the impact range of the construction project and the public who are concerned about the construction of this project.
(6) Main matters for soliciting public opinions:
① Is the public satisfied with the current environmental quality of the construction project location;
② The main factors affecting local environmental quality and the main sources of environmental pollution;
③ The public's understanding and response to construction projects;
④ What attitude does the public hold towards the construction of the project from an environmental perspective after understanding its situation;
⑤ What suggestions and requirements do the public have for the environmental protection of this project.
(7) The main ways for the public to express their opinions are:
The public can submit written opinions to the construction unit or its commissioned environmental impact assessment agency, as well as the environmental protection administrative department responsible for approving the environmental impact assessment report, through letters, faxes, emails, and other means after the relevant information is made public.
Link to the Public Opinion Form for Environmental Impact Assessment of Construction Projects:
http://www.mee.gov.cn/xxgk2018/xxgk/xxgk01/201810/t20181024_665329.html
(8) The starting and ending time for public opinions:
Within 10 working days from the date of announcement, the public can provide valuable opinions to the construction unit or environmental impact assessment unit through telephone, fax, email, and other means.